EXINOS2 - Development of a highly flexible and continuous system for optimized stack formation in battery production for use in series production
- Contact:
- Project Group:
wbk
- Funding:
Federal Ministry of Education and Research
- Partner:
acp systems AG, BST GmbH, J. Schmalz GmbH, Siemens AG, Fraunhofer-Einrichtung Forschungsfertigung Batteriezelle FFB
- Startdate:
01.01.2025
- Enddate:
31.12.2027
Objectives and Results
The project aims to further optimize the plant concept based on the results of previous research projects, with the ultimate goal of creating a plant that is suitable for industrial-scale, series production.
Content and Approach
- Continuous process flow: Optimization of the stack formation process through continuous instead of discrete process flow.
- Increased flexibility: Fast convertibility to various cell formats.
- Increased throughput: Efficiency increase through higher process speed.
- Digitalization: Use of multiphysical simulations and digital methods for process and machine development
Project Volume
5,2 mio. €